Inspector Machining Question:
Download Questions PDF

How would you estimate the weight of the Chrysler building?

Answer:

This is a process guesstimate where the interviewer wants to know if you know what to ask. First, you would find out the dimensions of the building (height, weight, depth). This will allow you to determine the volume of the building. Does it taper at the top? (Yes.) Then, you need to estimate the composition of the Chrysler building. Is it mostly steel? Concrete? How much would those components weigh per square inch? Remember the extra step: find out whether you're considering the building totally empty or with office furniture, people, etc. If you're including the contents, you might have to add 20 percent or so to the building's weight.

Download Inspector Machining Interview Questions And Answers PDF

Previous QuestionNext Question
Suppose there are three light switches outside a room. Inside is a single light bulb, controlled by one of the three switches. You need to determine which switch operates the bulb. You can turn the switches on and off as many times as you wish (they are all off to begin with), but may only enter the room once. There is no one there to help you. The door to the room is closed, and there are no windows, so you cannot see inside. How can you discover which switch operates the bulb?What can you tell me about team work as part of the job As Inspector Machining?