Manager Construction Question: The Critical path lies along activities having total float: A. positive B. negative C. zero D. same Construction Manager Interview QuestionAnswer: C. zero Previous QuestionNext QuestionCPM family is includes: A. CPA (Critical Path Analysis) B. CPP (Critical Path Plotted) C. MCE (Minimum Cost Expenditure) D. CPS (Critical Path Scheduling) E. All the aboveCPM is the: A. synthesising in concepts B. is built of activities oriented programme C. is based on time estimate D. is used for repetitive works E. all the above