Manager Construction Question:

CPM family is includes:

A. CPA (Critical Path Analysis)
B. CPP (Critical Path Plotted)
C. MCE (Minimum Cost Expenditure)
D. CPS (Critical Path Scheduling)
E. All the above

Construction Manager Interview Question
Construction Manager Interview Question

Answer:

E. All the above


Previous QuestionNext Question
Estimated time required to perform activity, is known as:

A. event
B. dummy
C. duration
D. float
The Critical path lies along activities having total float:

A. positive
B. negative
C. zero
D. same