Estimation and Costing Quiz Question.
Civil Engineering Quizzes Estimation and Costing
Question:
In case of laying gullies, siphons, intercepting traps, the cost includes
Option A):
Setting and laying
Option B):
Bed concreting
Option C):
All of these.
Option D):
Connection to drains
Correct Answer is Option C):
All of these.