Tarapur atomic power station

A. has two boiling water reactors of American design.
B. has an installed capacity of 400 MW.
C. is the first power reactor in India, which became critical in 1969.
D. all (a), (b) and (c).

Answer:

Option D

Download Nuclear Engineering Interview Questions And Answers PDF

Previous QuestionNext Question
Fast breeder Test Reactor (FBTR) is located at

A. Kalpakkam (near Madras).
B. Kota (in Rajasthan).
C. BARC (Trombay).
D. Tarapur (in Maharashtra).
In a nuclear explosion, the energy is released primarily in the form of __________ energy-

A. potential
B. thermal
C. kinetic
D. electrical