Aptitude Question:
Download Questions PDF

Pipes are laid by an oil company. If the company has to lay down 3km of pipes and each pipe is 25 meters long, calculate and print the number of pipes needed to cover the distance?

Answer:

I presume "cober" is a typo for "cover".

3km of pipes is 3000 meters.

3000 meters divided by each pipe length of 25 meters is 120.

Experience and prudence dictates that the oil company should acquire 126 pipes so that there will be no slow-down in the event of breakage or defects. But that's probably not really part of the question.

Download Aptitude Interview Questions And Answers PDF

Previous QuestionNext Question
A, B and C start at the same direction to run around a circular stadium. A completes a round in 252 sec, B in 308 sec and C in 198 sec, all starting at the same point. After what time will they meet again at the starting point?
a)26min 18sec
b)42min 36sec
c)45min
d)46min 12 sec
Ram travels by car from city A to city B heading towards north in 4 hours. From there he travels west to City C in 3 hours. Say his average speed is same during both the courses. Now from C he travels back to A in shortest path possible. How much time he would had taken to reach A from C?