Officer Quality Control Question:
Download Questions PDF

Explain about a time that you disagreed with management on a new policy or procedure. How did you handle the situation?

Answer:

FFS results indicated that we had to shut one of our transfer lines. This was not within Code standards due to internal metal loss. The company man did not agree on this as this would be a loss in production. I have reported this to the terminal manager and my line manager and gave them the results of the inspection. We then decided as a team to prepare for the repair works and shut the line.

While performing a routine inspection on a storage tank, I have noticed a bottom leak. According to Code the tank must be isolated, cleaned and repaired. The leak was slight and we as a team decided to build a secondary containment berm around the tank and monitor the leak on daily basis.

Download Sr. Officer Quality Control Interview Questions And Answers PDF

Previous QuestionNext Question
Explain about a time when you have had to make a big decision, such as shutting down a production line. How did you come to the conclusion and how did you proceed?Tell me can you describe the various responsibilities and roles of a quality engineer?