Aptitude Question:
Download Questions PDF

Anand finishes a work in 7 days, Bittu finishes the same job in 8 days and Chandu in 6 days. They take turns to finish the work. Anand on the first day, Bittu on the second and Chandu on the third day and then Anand again and so on. On which day will the work get over?
a) 3rd
b) 6th
c) 9th
d) 7th

Answer:

Ans is d) 7th day

In d 1st day Anand does 1/7th of total work

similarly,

Bithu does 1/8th work in d 2nd day

hence at d end of 3 days, work done = 1/7+1/8+1/6=73/168

remaining work = (168-73)/168 = 95/168

again after 6 days of work, remaining work is = (95-73)/168 = 22/168

and hence Anand completes the work on 7th day.(hope u understood.)

Download Aptitude Interview Questions And Answers PDF

Previous QuestionNext Question
Find the point of intersection of
15x+9y=15
5x+3y=21
When ¾ of a units digit is added to the tens digit of a two number, the sum of the digits becomes 10. If ¼ of the tens digit added to the units digit, then the sum of the digits is 1 less than the previous. Find the number.

a) 94
b) 84
c) 48
d) 88